// Rural Development //           


||  DRDA  || RURAL WORKS || RWS & S || RURAL ELECTRIFICATION || SOIL CONSERVATION || NABARD

 

District Rural Developement Agency 

 1.      Introduction

The District Rural Development Agency, Boudh is functioning independently with effect from 07.07.1994 after being separated from the mother District Rural Development Agency, Kandhamal. Following the 73rd amendment of the Constitution and the formation of the newly elected Panchayati Raj Institutions in the State, this District Rural Development Agency has been restructured in accordance with the instructions communicated vide Panchayati Raj Department Letter No. 2920/PR dt.17.03.1997. Now the D.R.D.A. office is functioning in its own building since 05.01.2001.

 2.      Administrative set up

                       The Governing Body of District Rural Development Agency, Boudh, which is at the apex of the administrative hierarchy, has been reconstituted under the Chairmanship of the President, Zilla Parishad. The Collector and Dist. Magistrate is functioning as Ex-officio Chief Executive Officer of DRDA. The Project Director is the Executive Officer of DRDA. There are 29 members in the Governing Body. The Governing Body is meets regularly to discuss various important issues and take decisions.

                        There are two Additional Project Directors, one administration and the other is technical. Apart from them there are five Posts of Asst. Project Directors i.e., Asst. Project Director (Training), Asst. Project Director (Scheme), Asst. Project Director (Credit), Astt. Project Director (MIS) and Asst. Project Director (Finance) in charge of various schemes.

Objectives

                        The District Rural Development Agency, Boudh is implementing various anti-proverty, self-employment and development programmes since 1994-95. This DRDA receives funds from the Government of India in the Ministry of Rural Development and the State Government for implementation of schemes like :

 

MGNREGS

                         During the year 2010-11 a sum of a sum of Rs.1590.00 lakhs & Rs.132.24 lakhs has been received from center & state Government respectively for implementation of MGNREGS work. Hence total funds including O.B of Rs.298.15 lakhs making a total of Rs.2020.39 lakhs.The detailed financial and physical position under  MGNREGS as on 29.03.2011 are as follows:-

(Rs.in lakh)

Name of the E.As

OB

as

on 1.04.10

Funds released

Total

Exp.

(200-11)

Total projects sanctioned (since inception)

Completed

(Since inception)

Farm pond (Up to 09-10)

Farm pond

(Mo Pokhori)

10-11

BNRGSK

1 2 3 4 5 6 7 8 9 10

BDO, Boudh

58.40

404.16

462.56

487.65861

865

220

550

303

22

BDO, Harabhanga

-72.59

458.48

385.89

562.74533

992

334

261

542

19

BDO, Kantamal

-7.22

474.46

467.24

500.15717

649

309

102

676

25

Sub-Total

-21.41

1337.10

1315.69

1550.56111

2506

863

933

1521

66

E.E, R.W, Boudh

0.00

0.00

0.00

0.00

1

 

 

 

 

E.E, M.I,Plb.

33.75

40.00

73.75

28.5115

23

 

 

 

 

E.E, R&B, Plb.

10.67

0.00

10.67

0.00

0

 

 

 

 

E.E, Irri, Boudh

49.17

75.00

124.17

82.38589

109

 

 

 

 

DFO(T), Boudh

26.24

20.00

46.24

13.80909

35

 

 

 

 

ASCO, Boudh

18.64

66.60

85.24

44.15612

149

 

72

65

 

AD(S), Plb.

5.15

6.19

11.34

6.92562

7

 

 

 

 

DDA, Plb

2.79

0.00

2.79

2.29161

3

 

 

 

 

DD(H), Plb.

0.00

100.00

100.00

70.98553

739

 

 

 

 

ADF, Boudh

0.00

45.00

45.00

7.00026

0

 

 

31

 

OREDA, Boudh

0.00

20.00

20.00

11.64273

197

 

 

 

 

Line deptt. Sub-total

146.41

372.79

519.20

*267.770835

1263

 

72

96

 

All E.As Total

125.00

1709.89

1834.89

 

3769

 

1005

96

 

DRDA

173.15

(173.15+1722.24=1895.39-1709.89=185.50)

185.50

5.45357

 

 

0

0

 

TOTAL

298.15

1722.24

2020.39

1556.01468

3769

863

1005

1617

66

 *N.B: Expenditure of line departments are reflected in Block figure.

                                                                           ABSTRACT

O.B of DRDA

Funds received

Totalfunds available

Released to E.As

Admn. Exp.

Total

Balance

173.15

1722.24

1895.39

1709.89

5.45357

1715.34357

180.04643

 

Achievement on Physical & Financial Position (Abstract) under NREGS

 Physical Position

 1)                   No. of Projects sanctioned (Since inception)                                        3769

                                    (Excluding Farm Ponds)

2)                   No. of Projects completed                                                              725

3)                   No. of projects balance                                                                  3044

4)                   Estimated cost for 3769 projects                                                    11131.37232 Lakhs

5)                  Estimated cost for 1005 Farm Ponds                                               359.50 Lakhs

6)                  Estimated cost for 1617 Farm Ponds(10-11)                                     632.68 Lakhs

7)                  Estimated cost for 66 BNRGSK                                                        705.00 Lakhs

8)                  Total project Estimated cost for 6397 projects                                  12828.552320 lakhs

Financial Position –I

Year

Opening

Balance

Central

+State

Misc.

Total

Expenditure

 Balance

 %

1

2

3

4

5

6

7

8

2005-06

523.54

25.00+813.64

3.17

1365.35

36.76

1328.59

For 2 months

2006-07

1328.59

1297.96

14.92

2641.47

1200.08

1441.39

45%

2007-08

1441.39

854.70

10.57

2306.66

1122.32

1184.34

48%

2008-09

1184.34

1082.922

2.12

2269.382

1184.47

1084.912

52%

2009-10

1084.912

377.78

6.77

1469.462

1171.31

298.15

80%

2010-11

298.15

1722.24

0.00

2020.39

1556.01468

464.37532

77.01%

 Cumulative Person days (In Lakhs)

                 

Year

SC

ST

Others

Total

Women

Remarks

1

2

3

4

5

6

7

2006-07

2.47

3.39

5.64

11.50

3.95

 

2007-08

1.72

0.77

3.00

5.49

2.05

 

2008-09

2.01

0.79

3.29

6.09

2.31

 

2009-10

1.55

0.75

3.19

5.49

2.25

 

2010-11

2.40

 1.24

6.16

9.80

4.39

 

 The status of registration, job-card issued & employment position (On-line report as on 29.03.2011) are given below:-

 

Sl. No.

Name of the Block

No. of household as per BPL census 2002

No. of household/families registered till date

Job-card issued

Employment provided (Households)

No of families completed 100 days

Total

Filled

Muster

Roll

 

Remarks

1

2

3

4

5

6

7

8

9

2009-10

Boudh

30853

28037

27857

6184

144

1916

 

Harabhanga

28410

24559

25124

5634

93

1608

 

Kantamal

33228

28367

27694

5791

98

1541

 

 

Total

92491

81868

80675

17609

335

5065

 

 2010-11

 

Sl. No.

Name of the Block

No. of household as per BPL census 2002

No. of household/families registered till date

Job-card issued

Employment provided (Households)

No of families completed 100 days

Total Filled

Muster

Roll

 

Remarks

1

2

3

4

5

6

7

8

9

2010-11

Boudh

30853

28037

27857

7466

253

3107

 

Harabhanga

28410

24559

25124

8168

556

3879

 

Kantamal

33228

28367

27694

6874

276

3291

 

 

Total

92491

81868

80675

22508

1085

10277

 

 

The break-up Water Conservation (WC), Rural Connectivity (RC), Flood Control (FC) and Forest Plantation (FP) is given below:-

 

District

Year

WC

RC

FP

DP

Land Dev.

Total

Completed as per on-line report

1

2

3

4

5

6

7

8

9

 

Boudh District

2006-07

78

317

0

0

0

395

0

2007-08

180

260

4

7

0

451

212

2008-09

499

178

42

10

2

731

25

2009-10

177

237

33

10

0

457

247

2010-11

 

 

 

 

 

1735

241

Total

 

 

 

 

 

 

3769

725

  

Mission Farm Ponds:- 

Block

Target

Identified

Sanctioned

Taken up

Completed

2007-08

2008-09

Total

1

2

3

4

5

6

7

8

BDO, Boudh

1500

550

265

285

550

550

65

BDO, Harabhanga

1500

520

85

149

234

234

85

BDO, Kantamal

1500

405

62

40

102

102

36

Total

4500

1475

412

474

886

886

186

ASCO

500

72

72

0

72

72

54

TOTAL

5000

1547

484

474

958

958

240

 Mission Farm Ponds:-

 

Name of the Executing Agency

Spill over

Target for

2010-11

Application received out of current year target

Total

(Col.2+Col.4)

Project taken up out of current year target

Total

taken-up

(Col.2+Col.6)

Completed

Out of col.7

Exp.

1

2

3

4

5

6

7

8

9

BDO,Boudh

485

3240

4585

5070

350

835

40

14.10

BDO,Harabhanga

149

3000

2530

2679

385

534

123

42.25

BDO,Kantamal

66

3700

2835

2901

696

762

58

48.37

ASCO, Boudh

18

60

66

84

0

18

11

2.60

Total

718

10000

10016

10734

1431

2149

232

107.32

  

(II)       Multipurpose Farm Ponds-

                           31 estimates with an estimated cost of Rs. 46.50 lakhs have been sanctioned and Rs. 15.00 lakhs have been released in favour of the ADF, Boudh out of which work order in respect of 31 beneficiaries have already been given by the ADF, Boudh

 

PLANTATION PROGRAMME UNDER MGNREGS

 

Sl. No.

Name of the Executing Agencies

Estimates received

Estimated cost.(Rs.in lakh)

Area of plantation

Type of plantation

1

2

3

4

5

6

1

Dy.Dire.Horticulture. Phulbani

534

480.962

248.7 Hct.

Mango

2

Assistant Director, OREDA, Boudh

197

72.3358

200 Hct.

Jatropha

3

ASCO, Boudh

114

91.65

47.10 Hct.

Mango

Total

 

845

644.9478

 

 

 

Engagement of GRS

 

Name of Blocks

No. of G.Ps

G.R.S. engaged

Boudh

21

20

Harbhanga

18

18

Kantamal

24

23

TOTAL

63

61

 

The selection of Gram Sanjojak in the above vacancy GPs are under process.

 

Gram Sanjojak

 

Name of Blocks

No. of G.Ps

Total no of rev. villages

Total Inhabited

Villages

Total no of Gram sanjojak

 

Boudh

21

415

382

522

Harabhanga

18

366

340

394

Kantamal

24

409

393

594

TOTAL

63

1190

1115

1510

 

BNRGSK

 

 a)   BNRGSK of Panchayat  Samities   

 

Name of the Block

BNRGSK of Panchayat

Samities

Funds required

(In Lakh)

Foundation level

BDO, Boudh

1

25.00

Plinth

BDO, Harabhanga

1

25.00

Not started

BDO, Kantamal

1

25.00

Not started

Total:

3

75.00

 

 

b)   BNRGSK of Gram Panchayats

 

Block

BNRGSK of G.Ps.

Funds required

(In Lakh)

Status of projects

BDO, Boudh

21

210.00

21(Plinth – 5,  Lintel Level – 5, Roof Level – 2, Roof Casted – 4, Finishing 5)

BDO, Harabhanga

18

180.00

18 ( Foundation – 1, Plinth – 9, Lintel – 1, Roof Level – 2, Finishing-3,Completed – 1, Not Started-1 )

BDO, Kantamal

24

240.00

24 (Foundation – 2, Plinth – 2, Lintel Level – 1, Roof Level -12, Roof Casted – 3, Finishing – 3, Completed – 1)

Total:

63

630.00

63 (Foundation – 3, Plinth – 16, Lintel – 7, Roof level – 16, Roof casted -7, Finishing – 11, Completed – 2, Not started-1 )

 

LABOUR ESTIMATE AND PREPARING A SHELF OF WORKS FOR THE NEXT FINANCIAL YEAR ( 2010-11)

 

MONTH

Number of Households likely to demand employment in 2010-11

Estimated  number of days of employment to be provided per Households

Number of Total Persondays likely to be generated in 2010-11

Estimated Total Expenditure in Next Financial Year
(in Lakhs)

Number of Households likely to complete 100 2010-11

APRIL

37

29

1068

5.02

0

MAY

970

24

23121

46.62

4

JUNE

3483

28

97258

121.68

36

JULY

9049

34

304093

381.43

116

AUGUST

11913

36

428589

548.16

236

SEPTEMBER

14349

37

525424

700.58

300

OCTOBER

17171

38

647352

1029.29

2649

NOVEMBER

19171

38

733666

1166.53

3472

DECEMBER

20331

48

978221

155.37

4060

JANUARY

23216

48

1107691

1761.23

4420

FEBRUARY

24008

52

12515447

1989.96

4902

MARCH

27028

53

1438560

2287.31

5646

PROJECTION OF DEMAND, EMPLOYMENT  & EXPENDITURE DURING  2010-11 UNDER MGNREGS

 Items

BPL Families as per 1997

No. of Jobcard issued

Households Demanded Employment

Household provided  employment

Personday to be generated

Average days

Projected Expenditure as per 80% of BPL families

Projected Expenditure as per 50% of Job Card Holders families

District

71872

75353

57498

57498

2932378

51

4867.75

3189.69

Boudh

22503

26714

18002

18002

918122

51

1524.08

1130.80

Harabahnga

21149

22595

16919

16919

862879

51

1432.38

956.45

Kantamal

28220

26044

22576

22576

1151376

51

1911.28

1102.44

District

71872

75353

57498

57498

2932378

51

4867.75

3189.69

PROJECTION OF DEMAND, EMPLOYMENT  & EXPENDITURE DURING  2010-11 UNDER MGNREGS

BOUDH BLOCK

Name of the G.P.

BPL Families as per 1997

No. of Jobcard issued

Households Demanded Employment

Household provided  employment

Person day to be generated

Average days

Projected Expenditure as per 80% of BPL families

Projected Expenditure as per 50% of Job Card Holders families

AINLAPALI

832

1035

666

666

33946

51

56.35

43.81

AMBAJHARI

1042

1442

834

834

42514

51

70.57

61.04

BADHIGAON

931

1482

745

745

37985

51

63.05

62.73

BAGHIAPADA

1224

1480

979

979

49939

51

82.90

62.65

BAHIRA

1070

1475

856

856

43656

51

72.47

62.44

BAUNSUNI

972

997

778

778

39658

51

65.83

42.20

BRAHMANIPALI

813

1123

650

650

33170

51

55.06

47.54

GOCHHAPADA

1055

990

844

844

43044

51

71.45

41.91

GUNDULIA

1261

1113

1009

1009

51449

51

85.41

47.11

KHUNTABANDHA

1015

1451

812

812

41412

51

68.74

61.42

LAXMIPRASAD

758

912

606

606

30926

51

51.34

38.60

MANUPALI

1874

2096

1499

1499

76459

51

126.92

88.72

MUNDAPADA

915

926

732

732

37332

51

61.97

39.20

MUNDIPADAR

978

1282

782

782

39902

51

66.24

54.27

MURUSUNDHI

804

1126

643

643

32803

51

54.45

47.66

PADMANPUR

926

1247

741

741

37781

51

62.72

52.79

ROXA

2108

1887

1686

1686

86006

51

142.77

79.88

SAGADA

1094

1238

875

875

44635

51

74.09

52.40

TALASARADA

883

1151

706

706

36026

51

59.80

48.72

TELIBANDHA

940

1044

752

752

38352

51

63.66

44.19

TIKARAPADA

1008

1217

806

806

41126

51

68.27

51.52

Total

22503

26714

18002

18002

918122

 

1524.08

1130.80

 

PROJECTION OF DEMAND, EMPLOYMENT  & EXPENDITURE DURING  2010-11 UNDER MGNREGS

HARABHANGA BLOCK

 

Name of the G.P.

BPL Families as per 1997

No. of Jobcard issued

Households Demanded Employment

Household provided  employment

Personday to be generated

Average days

Projected Expenditure as per 80% of BPL families

Projected Expenditure as per 50% of Job Card Holders families

ADENIGARH

1174

688

939

939

47899

51

79.51

29.12

BAMANDA

1110

1533

888

888

45288

51

75.18

64.89

BANDHAPATHAR

837

960

670

670

34150

51

56.69

40.64

BANIBHUSANAPUR

1530

1668

1224

1224

62424

51

103.62

70.61

BIRANARASINGHPUR

1118

907

894

894

45614

51

75.72

38.39

CHHATRANGA

862

1160

690

690

35170

51

58.38

49.10

DHALPUR

1106

1189

885

885

45125

51

74.91

50.33

HARABHANGA

1329

1413

1063

1063

54223

51

90.01

59.81

KUSANG

1545

2021

1236

1236

63036

51

104.64

85.55

LUNIBAHAL

1074

1120

859

859

43819

51

72.74

47.41

MATHURA

1393

1593

1114

1114

56834

51

94.35

67.43

PURUNAKATAK

1371

1464

1097

1097

55937

51

92.86

61.97

RAMGARH

978

1023

782

782

39902

51

66.24

43.30

SAMPOCH

1237

1162

990

990

50470

51

83.78

49.19

SANKULOI

866

948

693

693

35333

51

58.65

40.13

SARASARA

1259

1103

1007

1007

51367

51

85.27

46.69

TALAGAON

976

1108

781

781

39821

51

66.10

46.90

TILESWAR

1384

1535

1107

1107

56467

51

93.74

64.98

Total

21149

22595

16919

16919

862879

 

1432.38

956.45

 

 

PROJECTION OF DEMAND, EMPLOYMENT  & EXPENDITURE DURING  2010-11 UNDER MGNREGS

KANTAMAL BLOCK

 

Name of the G.P.

BPL Families as per 1997

No. of Jobcard issued

Households Demanded Employment

Household provided  employment

Personday to be generated

Average days

Projected Expenditure as per 80% of BPL families

Projected Expenditure as per 50% of Job Card Holders families

AMBAGAON

776

888

621

621

31661

51

52.56

37.59

BARAGAON

1472

1712

1178

1178

60058

51

99.70

72.47

BARAGOCHHA

984

948

787

787

40147

51

66.64

40.13

BILASPUR

1552

1258

1242

1242

63322

51

105.11

53.25

DAPALA

1246

1088

997

997

50837

51

84.39

46.06

GHANTAPADA

1536

1326

1229

1229

62669

51

104.03

56.13

GHIKUNDI

783

604

626

626

31946

51

53.03

25.57

GUDVELIPADAR

996

975

797

797

40637

51

67.46

41.27

JOGENDRAPUR

1134

875

907

907

46267

51

76.80

37.04

KANTAMAL

1219

931

975

975

49735

51

82.56

39.41

KHALIAPALI

692

736

554

554

28234

51

46.87

31.15

KHAMANAMUNDA

979

1002

783

783

39943

51

66.31

42.41

KHATAKHATIA

1621

1247

1297

1297

66137

51

109.79

52.79

KHUNTIGORA

920

949

736

736

37536

51

62.31

40.17

KULTAJORE

1382

1348

1106

1106

56386

51

93.60

57.06

LAMBASARI

1217

969

974

974

49654

51

82.42

41.02

MANAMUNDA

1666

1359

1333

1333

67973

51

112.83

57.53

NARAYANPRASAD

1327

1328

1062

1062

54142

51

89.88

56.21

PALASAGORA

1748

1504

1398

1398

71318

51

118.39

63.66

RENGALI

916

1039

733

733

37373

51

62.04

43.98

RUNDIMAHUL

728

710

582

582

29702

51

49.31

30.05

SIMILIPADAR

1391

1336

1113

1113

56753

51

94.21

56.55

SUNDHIPADAR

1241

1103

993

993

50633

51

84.05

46.69

UMA

694

809

555

555

28315

51

47.00

34.24

Total

28220

26044

22576

22576

1151376

 

1911.28

1102.44

 

SGSY

 

2010-11

 

                      The financial allocation for the year 2010-11 is Rs. 309.61 lakhs out of which a sum of Rs. 127.01 lakhs has been received from central Govt.& a sum of Rs.38.881 lakhs has been received from state Govt  making a total of  Rs.224.691 lakhs is available including O.B of Rs.58.80 lakhs under the scheme.  The tentative physical target of   2300 fixed by Govt. in PR Department has already been communicated among the BDOs & Bank-branches of the district vide this Agency Letter No.1559 dt.25.05.10.

 

Physical

Name of the Block

Target for

2010-11

No. of loan application

Target for credit

Target for subsidy

Total credit disbursed

Total subsidy disbursed

Total Investment

Investment per Swarozgaries

Subsidy and Credit Ratio

Sponsored Sanctioned Disbursed

1

2

3

4

5

6

7

8

9

10

11

12

Boudh

751(60)

1167(84)

791(66)

674(57)

164.49

75.10

143.708

55.675

199.383

0.30

8:22

Harabhanga

748(55)

1326(90)

864(65)

864(65)

163.84

74.80

202.70

71.420

274.120

0.31

8:23

Kantamal

801(65)

939(68)

339(26)

339(26)

175.36

80.10

36.35

36.350

72.70

0.21

10:11

TOTAL

2300(180)

3432(242)

1994(157)

1877(148)

503.64

230.00

382.76

163.45

546.203

0.29

9:28

 
Financial

(Rs. in Lakhs)

O.B.

as on 1.4.10

Central share

State share

Interest on deposit

Others

Total funds available

Expn.

Subsidy

Revolving fund

Training

Others

TOTAL

BALANCE

                       

1

2

3

4

5

6

7

8

9

10

11

12

58.80

127.01

38.889

0.00

0.00

224.691

163.45

15.97

0.49

20.89

200.80

(89.36%)

23.891

 

 

The detailed position of O.B as on 01.04.10 is given below.

 

Sl. No

Name of the Executing Agency

Project/purpose

Amount (Rs.in lakh)

placed/ available

1

CE, DSMS, Boudh

Establishment of computer aided design center at CFC, Bausuni

15.00

2

CE, DSMS, Boudh

Common facility center at Lunibahal

10.00

3

The Director, Animal & Husbandry, Orissa, Cuttack

Establishment of District Poultry Hatchery center at Boudh

9.73

4

The Director, ORMAS, BBSR

Revolving fund

15.97

5

Available at DRDA, Boudh

 

8.10

Total

 

58.80

 

Allocation 2010-11

(Rs. in lakh)

Center:                         232.21

State:                           77.40

Total:                            309.61

Out of which

Subsidy (60%):             185.766

Training (10%):             30.961

Infrastructure ( 20%):    61.922

Revolving fund (10%):    30.961

Total:                            309.61

 

Village Hats:-

 

                     During the year 2009-10, a sum of Rs.16.875 Laks have been received from Central Govt. as 1st installment and Rs.5.625 lakhs from the State Govt. of 2008-09 for setting of 3(three) Village Hats in this district. It has been decided in the District Governing Body Meeting held on 26.06.09 as per instruction of Govt. to set up Rural Hats in Kantamal Hqr. under Kantamal Block, Charichhak under Harbhanga Block and Guduguda under Boudh block. The funds for the above projects (Boudh Rs.7.50 lakhs, Harabhanga Rs.7.50 lakhs and Kantamal Rs. 7.50 lakhs) have been released to the BDOs of the district for construction of village haats.

 

IAY (Normal ) 2010-11

 

                    The allocation of IAY current year is Rs.635.67 lakhs for construction of 1413 IAY houses with an estimated cost of Rs.0.45lakhs. The above target for the year 2010-11 has already been distributed among the BDOs of this district.The BDOs have been instructed to issue work orders to the eligible beneficiaries (BDO Boudh on 21.05.2010, Harabhanga BDO on 25.05.2010 & Kantamal BDO on 28.05.2010) During the year 2010-11 a sum of Rs.467.184 lakhs has been received from central Govt.  & a sum of Rs.78.581 lakhs has been received from state Govt. Further a sanction order of Rs.51.431 lakhs has been received from state Govt. which is under process for drawal of the above amount. A sum of Rs.2.63 lakhs remaining as interest. Hence total funds including O.B of Rs.340.14 lakhs making a total of Rs888.535 lakhs under the scheme. The detailed physical & financial position is given below.

 

Name of the Block

Financial achievement(Rs. in lakh)

Physical achievement

Carry over

Current year

Total

Completed

Balance

O.B as on 01.04.10

Funds received

Total fund available

Expenditure

Balance

1

2

4

5

6

7

8

9

10

11

12

Boudh

851

442

1293

659

634

198.36

171.541

297.50502

231.45

66.05502

Harabhanga

482

416

898

282

616

52.09

161.451

145.40296

108.06

37.34296

Kantamal

572

555

1127

321

806

89.69

215.403

214.18802

145.07

69.11802

Total

1905

1413

3318

1262

(38%)

2056

340.14

548.395

888.535

484.58

(55%)

403.955

 

 IAY( Mo Kudia)

 

                         The allocation of current year is Rs.50.40 lakhs for construction of 112 nos. of houses under Mokudia with an estimated cost per house is 0.45 lakhs. During the year 2010-11 a sum of Rs. 50.40 lakhs has been received from state Govt. and distributed among the BDOs for construction of IAY(Mokudia) houses. The physical target of current year i.e 112 has been received from Govt. which has already distributed among the BDOs. An amount of Rs.89.13 lakhs is available under the scheme. The detailed physical and financial position as on 28.02.2011 is given below:-

 

Rs In Lakhs

Name of the Block

Physical

Financial (Rs. in lakhs)

Carryover

Current year target

Total

Completed

Balance

O.B.

as on 1.4.10

Funds received

Total fund available

Expenditure

Balance

1

2

3

4

6

7

8

9

10

11

12

Boudh

94

35

129

80

49

17.02

15.75

32.77

29.00

3.77

Harabhanga

52

33

85

29

56

6.80

14.85

21.65

11.90

9.75

Kantamal

121

44

165

34

131

14.91

19.80

34.71

20.24

14.47

Total

267

112

379

143

 

236

38.73

50.40

89.13

61.14

 

27.99

 

BRGF

                         During the year 2010-11 a sum of Rs.1004.00 lakhs has been received from Government (Balance amount of annual action plan of 2009). Further a sum of Rs.155.00 lakhs has been received from Govt. against the annual plan of 2011-12. Hence total funds including O. B of Rs. 277.16 aggregating to Rs.1436.16 lakhs. The proposal for release of 2nd installment under BRGF has already been submitted vide this Agency Letter No.4035 dt.24.12.10.The details progress of physical & financial achievement as on February’11 is indicated below:-

 

 

Sl. No.

Name of the implementing agency

Total funds available

Expenditure

Balance

Project taken up

Completed

1

2

3

4

5

6

7

1

ASCO, Boudh

28.58

19.95

8.63

7

2

2

E.E.M.I, Phulbani

5.60

1.60

4.00

4

4

3

E.E R&B Phulbani

7.00

0.00

7.00

1

0

4

E.E R.W, Boudh

36.33

0.00

36.33

4

0

5

E.E,Irrigation,Boudh

30.00

0.00

30.00

6

0

6

E.E RWS&S, Boudh

1.50

0.00

1.50

2

0

7

CDVO, Boudh

3.78

0.00

3.78

6

0

8

BDO, Boudh

267.58

255.60

11.98

280

150

9

BDO, Harabhanga

261.17

188.68

72.49

125

80

10

BDO, Kantamal

303.45

264.32

29.12

227

222

11

NAC, Boudh

300.75

127.68

173.07

62

18

12

DRDA, Boudh

190.42

9.09

181.33

6

0

 

Grand Total

1436.16

866.92

569.24

723

476

                                                                                                   

/

12th FCA

 

             The detailed position of receipt of funds and expenditure under 12 FCA  is indicated below.

 

Construction of GP/PS Road

 

Year

Amount allotted

Expenditure

Balance

Project taken up

Completed

2006-07

45.90

45.90

0.00

8

8

2007-08

53.79

27.56

26.23

14

9

2008-09

38.01

30.34

7.67

15

10

2009-10

45.90

17.30

28.60

12

5

Total:

183.60

121.10

62.50

49

32

 

Operation and maintenance of  Water Supply & Sanitation (OM W&S)

 

Year

Amount allotted

Expenditure

Balance

2005-06

148.72

148.72

0.00

2006-07

148.72

148.72

0.00

2007-08

148.72

148.72

0.00

2008-09

148.72

148.72

0.00

2009-10

148.72

148.72

0.00

Total:

743.60

743.60

0.00

 

                      Further during the year 2009-10 a sum of Rs. 42.75021 lakhs has been received from Govt. for Procurement of Laptop, Laser prenter and application software for GP and PS. In the meantime 12 laptop & 57 computers have been received from OCCAC, Bhubaneswar and stored at Block. A sum of Rs.16.50 lakhs has been received from Govt for 20 seater with LAN & Rs.11.11446 lakhs has been received from Govt. for purchase of computer table, chair & godrej etc.

 


 

13th FCA

                      The Action plan for 13th FCA has already been submitted to Govt. vide this Agency Letter No.4063 dt.26.12.10.The detailed physical & financial position is given below.

Sl.

No.

Name of the Block

Purpose

Funds allotted
(Rs.In lakh)

Expn. (Rs.In lakh)

UC submitted

(Rs.In lakh)

Projects in number

 

Taken up

Completed

1

 

2

3

4

5

6

7

1

Boudh

O&M of Drinking Water Supply Systems & Swerage& Solid waste management(Rural Sanitation)

38.440

 

 

 

 

Harabhanga

33.044

 

 

 

 

Kantamal

42.886

 

 

 

 

Sub-total

114.370

0.00

 

 

 

2

Boudh

Repaire & maintanance of 20 seaters Digital DataBase mamagement system at each block.

0.10

 

 

 

 

Harabhanga

0.10

 

 

 

 

Kantamal

0.10

 

 

 

 

Sub-total

0.30

0.00

 

 

 

3

Boudh

Operation & maintanance of Computers, prenters etc. in all GPs.

0.63

 

 

 

 

Harabhanga

0.54

 

 

 

 

Kantamal

0.72

 

 

 

 

Sub-total

1.89

0.00

 

 

 

4

Boudh

 

1.89

 

 

 

 

Harabhanga

 

1.62

 

 

 

 

Kantamal

 

2.16

 

 

 

 

Sub-total

Others(Specify)Conducting audit of GPs

5.67

0.00

 

 

 

 

 

Total

244.46

0.00

 

 

 

 

SFC

                          During the year 2009-10 a sum of Rs20.00 lakhs has been received from state Govt. for construction of New GP Building & Rs 3.50 lakh for construction of GP/PS road. The detailed are as follows.

Name of the Block

Name of the GP

Funds allotted

Remarks

Boudh

Mundipadar

5.00

 

Harabhanga

Banibhusanpur

5.00

 

Kantamal

Baragochha

5.00

 

 

Kultajore

5.00

 

 

                          During the year 2010-11a sum of Rs10.00 lakhs has been received from Govt. for construction of new GP building/ Addl. building/ Repairing of building/completion of building. The details are as follows.

 

Name of the Block

Name of the GP

Funds allotted

Remarks

Boudh

Manupalli

2.00

 

Mundipadar

2.00

 

Telibandh

2.00

 

Harabhanga

Adenigarh

2.00

 

Kantamal

Palasagora

2.00

 

 

Total

10.00

 

                            During the year 2010-11a sanction order vide PR Deptt. Letter No.30541 dt.16.10.10 of Rs3.75 lakhs has been received from Govt. for construction Repair & improvement of GP/PS road. The BDOs are declared as DDO.The details are as follows.

 

                                (Rs.in lakh)

Sl No.

Name of the Block

Amount allotted

Remarks

1

Boudh

1.25

 

2

Harabhanga

1.25

 

3

Kantamal

1.25

 

 

Total

3.75

 

 

                             During the year 2010-11a sanction order vide PR Deptt. Letter No.30382 dt.12.10.10 of Rs47.72292 lakhs has been received from Govt. as 1st installment for maintenance &  Repair & of rural road GP/PS roads as black top roads/cement concrete roads. The BDOs are declared as DDO.The details are as follows.

(Rs.in lakh)

Sl No.

Name of the Block

Amount allotted

 

Remarks

1

Boudh

15.90764

 

2

Harabhanga

15.90764

 

3

Kantamal

15.90764

 

 

Total

47.72292

 

 

            During the year 2010-11a sanction order vide PR Deptt. Letter No.14819 dt.21.05.10 of Rs0.47769lakhs has been received from Govt. for maintenance &  Repair & of Block Staff quarters. The BDOs are declared as DDO.The details are as follows.

(Rs.in lakh)

Sl No.

Name of the Block

Amount allotted

 

Remarks

1

Boudh

0.15923

 

2

Harabhanga

0.15923

 

3

Kantamal

0.15923

 

 

Total

0.47769

 

 

MIPs (Below 40 Hct)

 

                        During the year 2010-11a sanction order vide PR Deptt. Letter No.35698 dt.14.12.10 of Rs18.50lakhs has been received from Govt. for maintenance &  Repair  of MIPs (Ayacut blow 40 Hct) ( out of which 1 partly derelict project Rs.10.00 lakh,5 nos. completely derelict projects @ 3.50 lakhs  Rs.17.50 lakh). As per the revised guidelines machines can be used for renovation of MIPs. The labour purpose shall be met out of MGNREGS grant.

 

C.C Road (Cement Concrete Road in villages)

 

                         During the year 2010-11 a sum of Rs.71.65599 lakhs has been received from State Govt. for construction of Cement concrete Roads in villages which has already been distributed among the BDOs of this district vide this Agency letter No.   3998  date. 23.12.2010.The detailed progress of work is given below.

 

Name of the Block

Total funds allotted

Expn.

Balance

Projects taken up

completed

On-going

Length of CC road constructed

Village covered

Mandays generated

1

2

3

4

5

6

7

8

9

10

Boudh

23.88533

5.00

18.88533

5

0

5

300MT

5

0.01

Harabhanga

23.88533

 

 

 

 

 

 

 

 

Kantamal

23.88533

10.00

13.88533

13

0

13

 

 

0.03

Total

71.65599

15.00

56.65599

18

0

18

 

 

0.04

 

 

Status of C.C Road.

 

Name of the Block

Total No. of G.P

Total no. of the village

Total length of internal village Road

(In Mtr.)

Total length of existing concrete road

(In Mtr.)

SC/ST inhabitants complete with CC Road

(In Mtr.)

 If no. length of the road to be taken up for covering full length in ST/SC habitation

(In Mtr.)

Approx cost for executing CC road

(in Rs.)

Boudh

21

360

99125

44545

No

33820

67700000

Harabhanga

18

362

152220

56036

No

35530

71060000

Kantamal

24

217

83222

44324

No

30435

51290000

Total

63

939

334567

144905

No

99785

190050000

 

Top

 RURAL WORKS

 

ABSTRACT FOR PMGSY/ADB ASSISTED PMGSY WORKS (BOUDH DISTRICT) ENDING MARCH-2011

Sl. No.

Phase

No. of Package

Proposed Length of road

No. of roads taken

No. of roads dropped

No. of roads completed

No. of roads in Progress

Length of road completed

Sanctioned Cost

Awarded Cost (Excluding Maintenance)

Value of work done

Expenditure

% of work done

% of Expr

Remarks

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

Phase-I 2000-01

1

9.81

2

0

2

0

9.81

124.29

124.29

121.23

121.23

97.54%

97.54%

Completed

2

Phase-II 2001-02

4

32.39

17

2

15

0

32.22

575.81

569.13

560.52

559.56

98.49%

98.32%

Completed

3

Phase-III (Part-I) 2003-04

2

14.95

8

0

8

0

14.14

218.11

209.48

215.39

194.11

102.82%

92.66%

Completed

4

Phase-III (Part-II) 2003-04

3

24.59

13

0

11

2

21.02

377.29

384.73

341.55

339.25

88.78%

88.18%

Work in progress

5

Phase-IV 2004-05

2

27.17

6

0

5

1

25.48

477.65

462.47

419.09

416.19

90.62%

89.99%

Work in progress

6

Phase-V 2005-06

2

17.15

7

0

7

0

16.63

349.52

344.47

303.66

303.66

88.15%

88.15%

Completed

7

ADB Assisted Batch-I

1

28.59

4

0

3

1

28.87

589.29

527.25

509.23

509.23

96.58%

96.58%

Work in progress

8

Phase-VI 2006-07

5

40.34

20

0

10

10

31.36

1074.53

1056.53

789.58

789.58

74.73%

74.73%

Work in progress

9

Phase-VII 2007-08

11

79.60

27

0

12

15

66.24

2867.87

2782.19

2410.25

2410.25

86.63%

86.63%

Work in progress

10

Phase-VIII 2008-09

17

117.82

18

0

0

18

28.03

4094.40

4110.06

2315.24

2315.24

56.33%

56.33%

Work in progress

 

Total Road

48

392.41

122

2

73

47

273.79

10748.76

10570.60

7985.74

7958.30

75.55%

75.29%

 


 

ABSTRACT FOR PMGSY/ADB ASSISTED PMGSY BRIDGESWORKS (BOUDH DISTRICT)ENDING MARCH-2011

 

Sl. No.

Phase

No. of Package

Proposed Length of Bridge
(In Mtr)

No. of Bridges taken

No. of Bridges dropped

No. of Bridges completed

No. of Bridges in Progress

Length of Bridges completed

Sanctioned Cost

Awarded Cost (Excluding Maintenance)

Value of work done

Expenditure

% of work done

% of Expr

Remarks

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

OR-06-LB-01

 

32.50

1

0

0

1

0.00

130.05

102.84

102.73

102.73

99.89%

99.89%

Work in progress

 

Total Bridge

 

32.50

1

0

0

1

0.00

130.05

102.84

102.73

102.73

99.89%

99.89%

 

 

G.Total Road+Bridge

 

424.91

123.00

2.00

73.00

48.00

273.79

10878.81

10673.44

8088.47

8061.03

75.78%

75.52%

 

  

Progress Report of RIDF Bridge Projects under NABARD Assistance under R.W. Division,Boudh ending March -2011

(Rs. In Lakhs)

Sl.
No.

Name of the Constituency

NABARD RIDF Tranche

Name of the Project

Span arrangement

Sanction cost

Agrt. cost

Date of
Commencement
Date of completion

Allotment issued

Physical details

Financial Progress

Remarks

Target

Achievement

Expenditure upto 3/2010

Expenditure upto last month during 2010-11

Expenditure during the month

Cumulative expenditure during
2010-11 (13+14)

Upto date expenditure including previous  years (12+15)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

1

Boudh

RIDF XII

Constn. Of H.L over Salki nallah at 1st Km on Baghiapada Sagada road in Boudh District.

4x30.63

405.96

378.130

11.01.2011
10.04.2012

08-09=2.00
09-10=8.24
10-11=30.00

4x30.63m
H.L
Bridge
open foundation GAD No 2085/ R.W/ June -2008

Left- abutment , pier are in progress

10.36

0.00

30.00

30.00

40.36

Revised A/A accorded for an amount of  Rs 405.96 lakhs vide R.D Deptt letter No 7609 dated 12.10.10
Approved & accepted tender received vide letter No 19760 dated 29.11.2010 of C.E.R.W-I (O) BBSR & agreement drawn . Foundation of left abutment and P1 reinforcement work has been taken up .

2

Boudh

RIDF XV

Construction of H.L Bridge over Kapakhai nallah on Baghiapada - Birigada road

3x25.35m

324.320

299.840

01.01.2011
30.06.2012

10-11=20.00

3x25.35m H.L Bridge
Well foundation Revised GAD No 2775/ R.W / Feb -2011

Foundation work is in progress

 

 

20.00

20.00

20.00

A/A accorded for an amount of Rs 324.32 lakhs vide R.D Deptt. letter No 4486 dated 2.7.10.
Approved / accepted tender received vide letter No 3887 dated 24.11.2010 of SERWC, Berhampur  & agreement drawn .
Confirmatory boring completed..

3

Boudh

RIDF XIV

Construction of H.L Bridge over Laxmi Nallah at 21st Km on Boudh - Dhalpur road
 ( 3x25.35m)

3x25.35 m

290.390

294.770

28.02.11
27.01.12

10-11=20.00

3x25.35m H.L Bridge
open  foundation GAD No  R.W

Foundation work is in progress

 

 

20.00

20.00

20.00

A/A accorded for an amount of Rs 290.39 lakhs vide C.E.R.W-I (O) BBSR letter No 30890 dated 22.12.08
Approved / accepted tender received vide letter No 230 dated 19.01.2011 of SERWC, Berhampur. & agreement drawn comfirmatory boring completed

4

Kantamal

RIDF XVI

Construction of submerrible  Bridge over Mehuruni river at 10th Km on Khaliapali - Lambasory road

6x10.77m

236.100

207.770

10.12.2010
09.11.2011

10-11=40.00
10-11=42.00
Total=82.00

6x10.77m
S.Bridge Raft foundation  GAD No 2278/ R.W / May -2009

Sub-structure nearing completion & P-1  - P2 slab cast

 

27.57

54.43

82.00

82.00

A/A accorded for an amount of Rs 278.67 lakhs vide CERW-I (O) BBSR letter No 11563 dated 26.7.10 . Tender accepted vide letter No 3492 dated 12.10.2010 of S.E.R.W, Circle, berhampur & agreement drawn . Work in progress

5

Kantamal

RIDF XVI

Construction of H.L Bridge over river  Bagh at 25th Km on MSG road

5x30.63m

727.590

677.220

24.02.11
23.10.12

10-11=32.50

5x30.63m H.L Bridge
Well foundation GAD No 2410/ R.W / Dec-2009

Confirmatory boring is in progress
Approch road is in progress

 

 

32.50

32.50

32.50

A/A accorded for an amount of  Rs 727.59 lakhs vide R.D Deptt letter No 5809 dated 12.08.10 .Approved / accepted tender received vide letter No 21581 dated 21.12.2010 of CERW -I (O) BBSR . Agreement drawn.

6

Kantamal

RIDF

Construction of Bridge over local nallah ( 3 nos) including approches on PGBM road

 

557.40

 

 

 

 

 

 

 

 

 

 

Estimate submitte4d to Finance Deptt. vide CERW-I (O) BBSR letter No 11760 dated 29.7.10 for NABARD Assistance

 Monthly Progress Report (Residential/Non-residential) for R.W.Division,.Boudh for the month ending March -2011 (Plan Scheme  Building works)

 

Sl. No.

Name of the R.W.Division

Name of the work

A/A No. & Date

A/A Amount/
Estimated cost
Civil=
E.I.=
P.H=
________________
Total=

Year wise allotment
(Rs. in Lakhs)

Agreement No/Agrt.Value/
Name of Agency

Date of Commencement/Due date of completion

Upto date expend.including 16% P.C. (Prev. Month +This month) Rs in lakhs

Physical Status

Remarks

1

2

3

4

5

6

7

8

9

10

11

1

Boudh

R.W.Office Building at Boudh

A/A for Rs.29.01 lakhs accorded vide C.E.R.W.(O)
Lr.No.8121
dt.4.03.2008_______
Revised A/A for Rs 43.59 lakhs accorded vide C.E.R.W-II (O) BBSR letter No 14902 dated 13.09.10

A/A amount =Rs.29,01,000
Est.cost=Rs.2901000
Civil=Rs.2419000
E.I. =Rs.241000
P.H.=Rs.241000
Total .Rs.2901000
Revised A/A amount   Rs.4359000.00
Est. cost= Rs 4359000.00
Civil= 3515000.00
E.I internal= 351000.00
E.I external= 382000.00
P.H internal= 111000.00

07-08 =  7.00
(NP)  =  4.64
08-09 =  6.12
09-10 =  4.50
10-11 = 10.20
 Total     32.46

35F2/2008-09 to 42 F2/2008-09


Sri Santosh Kumar Sahu
&

Sri Raghunath Swain

15.03.2008
31.03.2009

26.87+5.59=32.46

Work Completed

 

2

Boudh

PHC (New) at Amajhari

A/A for Rs.14.65 lakhs accorded vide Director of Health Service (O)
Lr.No.4927
dt.16.12.09

A/A amount Rs.1464945
Est.Cost=Rs.1464945
Civil=Rs.1131747.00
E.I. =Rs.113174.00
P.H.=Rs.220024.00
Total.Rs.1464945

08-09=3.50
09-10= 6.93
Total:- 10.43

06P1/08-09
Agr.value Rs.902860

Girijanandan Dani

6.11.2008
5.5.2009

12.92+0=12.92

Work completed .

 

3

Boudh

Facilation Center Kantamal

A/A for Rs.2.50 lakhs accorded vide
Collector Boudh
Lr.No.319
dt.30.7.2008

A/A amount Rs.296320
Est.Cost=Rs.296320
Civil=Rs.246934
E.I. =Rs.24693
P.H.=Rs.24693
Total.Rs.296320

2008-09=2.50

72F2/2008-09
Agt.Value Rs.194320
Muketeswar Nayak

27.09.2008
26.11.2008

2.5+0=2.5

Work Completed

Revised estimate for Rs 2.96 lakhs submitted to  Collector ,Boudh for  revised A/A vide E.E.R.W, Boudh letter No 1213 dated 2.10.08

4

Boudh

Tahasil office Harabhanga at Charichhak in Boudh District.

A/A for Rs 54.15  lakhs accorded vide Collector ,Boudh letter No 105 date 19.3.09.
Revised A/A for Rs 70.92 lakhs accorded vide Collector , Boudh lt No 212 dt. 28.03.11

A/A amount Rs.5414748
Est.Cost=Rs.5414748
Civil=Rs.4409870
E.I=Rs.440987
P.H=Rs.563891
Total=Rs.5414748
Revised A/A Amount Rs 7092000/-
Est Cost= 7092000/-
Civil Cost = 5701412/-
E.I internal= 440987
E.I External= 385666/-
P.H Internal & External= 563891/-

2008-09=5.25
2009-10=22.15
2010-11 =19.67
Total=47.07

550 P1/2008-09
Agt.ValueRs.3955384

Sri Krushna Chandra Behera

28.02.2009
27.08.2009

31.54+15.53=47.07

Finishing works are in progress

 

5

Boudh

Construction of R.W Section-II office Building at Boudh under R.W.Division,Boudh

A/A for Rs.8.55 lakhs accorded vide C.E.R.W-II (O) BBSR
Lr.No.16717
dt.18.07.09

A/A amount Rs.855,000
Est.Cost=Rs.855,000
Civil=Rs.713,000
E.I=Rs.71000
P.H=Rs.71000
Total=Rs.855,000

09-10= 3.50
10-11=5.89____
Total =9.39

60 P1/ 2009-10
Ag value 700898
Sri R.N Swain

9.11.2009
8.5.2010

 5.48+3.91= 9.39

Fiishing work in progress

 

6

Boudh

Construction of R.W Section-II office Building at Purunakatak under R.W.Division,Boudh

A/A for Rs.9.00 lakhs accorded vide C.E.R.W-II (O) BBSR
Lr.No.16724
dt.18.07.09

A/A amount Rs.900000
Est.Cost=Rs.900000
Civil=Rs.657000
E.I=Rs.66000
P.H=Rs.179000
Total=Rs.900000

09-10= 6.00
10-11= 0.65___
Total =6.65

41 P1/ 2009-10
Ag value 606653/-
Sri Supernesh Purahit

30.10.2009
29.04.2010

6.91+0= 6.91

 

Completed

7

Boudh

Construction of R.W Section-II office Building at Kantamal under R.W.Division,Boudh

A/A for Rs.10.10 lakhs accorded vide C.E.R.W-II (O) BBSR
Lr.No.30138
dt.7.12.09

A/A amount Rs 1010091
Est.Cost=1010091
Civil=651943
E.I=180597
P.H=177551
Total=1010091

09-10= 6.10
10-11= 2.89___
Total= 8.99

40P1/ 2009-10
Ag value 579355
Sri Sarat Kumar Sahu

30.10.2009
29.04.2010

6.72+0= 6.72
Paid to E.I = 2.27
Total= 8.99

Completed External E.I , P.H to be completed

Revised estimate of Rs 13.23 lakhs submitted  to CERW-II (O) BBSR for revised A/A vide SERWC, Berhampur lt. No CAMP, BBSR dt. 8.03.2011
An amount of Rs 2.04 lakhs ( Excluding PC) deposited to the EE, Electrical Division BBSR.

8

Boudh

Construction of D,E & F type Qtr at Harabhanga Tahasil

A/A for Rs.30.74 lakhs accorded vide of Collector & D.M , Boudh
Lr.No.4488
dt.7.10.09
Revised A/A  for Rs 44.64 accorded vide of Collector & D.M , Boudh
Lr.No.456
dt.4.09.10

A/A amount Rs 3073800
Est.Cost=3073800
Civil=2573229
E.I=250294
P.H=250294
Total=3073800
Revised A/A amount Rs 4464000
Est.Cost=4464000
Civil=3732385
E.I=367454
P.H=364408
Total=4464000

2009-10=15.00
2010-11 =9.90
Total =    24.90

43 P1/ 2009-10
Ag value 2283619
A. K Sahu

30.10.2009
29.04.2010

19.80+5.40= 25.20

Finishing works are in progress

 

9

Boudh

Construction of " D" type Qtr for E.E ( Res) at Boudh

A/A for Rs 19.90 lakhs accorded vide C.E.R.W-II (O) BBSR letter No 14716 dated 8.09.2010

A/A amount Rs 1990000
Est.Cost=1990000
Civil=1599000
E.I=170500
P.H internal & external =220500
Total=1990000


2010-11 = 3.00

567 P-1/ 2010-11
Agrt. Value Rs 1468986.00
Santhosh Kumar Sahu

28.02.2011
27.06.2011

0+3.00= 3.00

Piling completed pile cap in progress

Agreement drawn and work in progress.

10

Boudh

Construction of PHC (N) building at Sagada

A/A for Rs 13.65 lakhs accorded vide Director of Health Service, Odisha letter No 27521 dated 23.08.10

A/A amount Rs 1365000
Est.Cost=1365000
Civil=1154026
E.I=105444
P.H=105444
Total=1364914

2010-11=7.50

418 P1/ 2010-11
Ag value 978164/-
Sri Ragadhara  Dandia

6.12.2010
5.04.2010

3.65+13.85=7.50

Work above lintel is in progress

Agreement drawn and work in progress.

11

Boudh

Construction of PHC(New) buildidng at Talagaon

A/A for Rs.22.20lakhs accorded vide Director of Health Service, Odisha letter No.4846 dated 29.09.2010

A/A amount Rs.2220000.00
Est.Cost=2220000.00
Civil=1764119.00
E.I. internal & E.I.External=220322.00
P.H Internal & External =235554.00_____________
Total=2219995.00
 

2010-11=7.00

417 P1/ 2010-11
Ag value 1670295/-
Sri Bikari Cccharan Sahoo

6.12.10
05.04.2011

3.87+3.13=7.00

Work above F & P & compound wall is in progress

Agreement drawn and work in progress.

 Monthly Progress Report (Residential/Non Residential ) R.W.Division,.Boudh for the month of ending March-2011 (Deposit scheme)
 

Sl. No.

Name of the R.W.Division

Name of the work

A/A No. & Date

A/A Amount/
Estimated cost
Civil=
E.I.=
P.H=
________________
Total=

Year wise allotment
(Rs. in Lakhs)

Agreement No/Agrt.Value/
Name of Agency

Date of Commencement/Due date of completion

Upto date expend.including 16% P.C. (Prev. Month +This month)

Physical Status

Remarks

1

2

3

4

5

6

7

8

9

10

11

1

Boudh

Construction of Record room for Tahasil office at Kantamal(Deposit)

A/A for Rs.5.00 lakhs accorded vide Collector Boudh
Lr.No.315
dt.30.7.2008

A/A amount =Rs.499937
Est.cost=Rs.499937
Civil=Rs.465059
E.I. =Rs.34878
P.H.=___________
Total .Rs.499937

Deposit-
5 .00lakhs

16P1/08-09
Rs.426216

Sri Tarun Kanhar

30.11.2008
1.03.2009

4.98+0=4.98

Work completed

 

2

Boudh

D' type Quarter at Manmunda

A/A for Rs.24.00 lakhs accorded vide NRHM
Lr.No.920
dt.10.10.2008

A/A amount Rs.2419714
Est.Cost=Rs.2419714
Civil=Rs.2016428
E.I. =Rs.201643
P.H.=Rs.201643
Total.Rs.2419714

Deposit-
2008-09=24.00lakhs
2009-10=0.20
Total= 24.20

03/08-09
Rs.1716592

Girijanandan Dani

3.11.2008
2.05.2009

19.83 +3.24 =23.07

Work completed

Revised estimate for Rs 24.20 lakhs submitted to NRHM vide E.E.R.W, Boudh letter No 882 date 26.08.08.

3

Boudh

Construction of Ayurvedic Dispensary Building at Baghiapada

A/A for Rs.13.55 lakhs accorded vide Mission Director NRHM (O)
Lr.No.15220
dt.21.12.09

Est.Cost=Rs.1354516
Civil=Rs.1059781
E.I. =Rs.97381
P.H.=Rs.197353
Total.Rs.1354516

Deposit-
3.40 lakhs

59P1/ 2009-10
Rs 779555/-
Sri Ashis Ku Karna

5.11.2009
4.05.2010

 

Agreement drawn
Site not handed over

Estimate for Rs 13.524 lakhs submitted to Mission Director N.R.H.M (O) BBSR vide EE,Boudh letter No 2076 dated 11.08.09 for A/A & placement of funds .
Site not handed over.
D.D for Rs 3.40 lakhs has been received vide MD. NRHM letter No 15215 dated 21.12.09.

U.C Position

"D" type quarter Manmunda U.C submitted  Rs 19.83 lakhs vide E.E letter No 962 dated 22.06.2010

Record room for Tahasil office at Kantamal U.C. submitted Rs.2.73 lakhs vide E.E. letter No.2730 dated 22.12.2010

Record room for Tahasil office at Kantamal U.C. submitted Rs.2.26 lakhs vide E.E. letter No.2730 dated 22.12.2010

Progress report of BR.G.F.07-08 (Road) Scheme implemented under  R.W. Division Boudh for the month ending    March -2011
 

FORMAT-3 (IV) F

 

Sl. No.

Name of work

FOR

2007-08

Project Sanctioned Amount Rs  in lakhs

Estimate prepared

A/A accorded

Allotment placed

Technical sanction

Tender invited

Date of receipt

Work order issued

Physical Target/ Achievement

Expr. During this month

Upto date Expr.

Remarks. Agmt. Value/Doc/Soc of work in lakhs

Yes/ No

Yes/ No

Yes/ No

Yes/ No

Yes/ No

Yes/ No

E.W.

GSB

WBM/
C.C.

BT

CD/
Causeway

MRW

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

1

Baghiapada - Sagada road from (1/0 to 2/640 Km)

20.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 

 

1.640

 

 -

 -

 

20.00

Ag.Value Rs.20.06
12.11.08/11.5.2009
Work closed . Balance fund  of 8.96 lakhs deposited to DRDA as the balance work is taken up under PMGSY

0.000

 -

2

Baunsuni Gundulia road.(Baunsuni chhak to Baunsuni 0/154 to 0/437 km)

10.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 

 

0.282

 -

 -

 -

 

9.88

work completed
Ag.Value Rs.9.88
14.11.08/13.3.2009

0.177

 -

3

Janapanka - Khamaripada road at 11th Km(Const. of 14 row 1000 HPVC)

10.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 -

 -

 -

 -

1

 -

 

9.96

work is completed
Ag.Value Rs.9.89
6.11.2008 /5.3.2009

 -

0

4

Purunakatak - Dhalpur road (7/743 to  10/028 Km)

20.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 

 -

2.28

2.28

 -

 -

 

19.77

work completed
Ag.Value Rs.20.06
15.11.2008 /14.5.2009

0

 

 -

5

Harabhanga Dhalpur road 13/328 to 14/0 Km

13.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 -

0.672

0.672

0.672

2

 -

 

12.88

work completed
Ag.Value Rs.13.04
10.11.2008 /9.3.2009

0

 

2

6

Kusanga Mohalikpada road 1/930 to 2/515 Km

7.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 -

0.585

0.580

0.585

 -

 -

 

6.90

work  completed
Ag.Value Rs.7.01
6.11.2008 /5.2.2009

0.000

0.000

 -

7

Baragochha - Dapalla road 8/690 to 9/603 Km

7.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

0.913

0.913

0.913

 -

 -

 -

 

6.72

work icompleted
Ag.Value Rs.6.92
3.11.2008 /2.02.2009

0.000

 -

8

Similijore Ambagaon via Narayanprasad road 9/0 to 10/366 Km

15.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 

 

1.366

1.366

 -

 -

 

14.85

 work completed
Ag.Value Rs.15.07
6.11.2008 /5.03.2009

1.366

1.366

 -

9

Khaliapalli Lambosory road 7/0 to 7/747 Km

8.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 

 -

0.747

0.747

 -

 -

 

8.00

work completed
Ag.Value Rs.8.03
14.11.2008 /13.2.2009

0.000

0.000

 -

10

Const. of VRB at R.D.6/880 Km of Kampara distributary of kampara village

5.00

Yes

Yes

Yes

Yes

Yes

24.9.2008

Yes

 -

0.06

0.06

 -

1

 -

 

5.00

Ag.Value Rs.4.95
24.11.2008 /23.2.2009
work in progress

Funds received vide
B.D. No699574 dt.7.6.2008 vide Lr.2127  dt.9.6.2008 Rs.1.15 crore of Collector Boudh.

0

0

 

 

115.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

113.96

 

 

Funds Received

For 2007-08=115.00 lakhs  BD No 699574 dated 7.06.2008 vide letter No 2127 dated 9.06.2008.

For 2008-09 = 12.00 lakhs  BD No 302184  Dated 31.01.10 vide letter No 299 Dated 1.2.2010        

Total Rs 127.00 lakhs

U.C submitted Rs 79.41 lakhs vide E.E letter No 1675 dated 20.7.2009

U.C submitted Rs 5.45 lakhs vide E.E letter No 2386 dated 11.09.2009

U.C submitted Rs 27.73  lakhs vide E.E letter No 1333 dated 26.7.2010

Total Rs 112.59lakhs         97.90% expenditure

 

Sl. No.

Name of work

FOR

2008-09

Project Sanctioned Amount Rs  in lakhs

Estimate prepared

A/A accorded

Allotment placed

Technical sanction

Tender invited

Date of receipt

Work order issued

Physical Target/ Achievement

Expr. During this month

Upto date Expr.

Remarks. Agmt. Value/Doc/Soc of work in lakhs

Yes/ No

Yes/ No

Yes/ No

Yes/ No

Yes/ No

Yes/ No

E.W.

GSB

WBM/
C.C
C.D.

BT

CD/
Causeway

MRW

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

1

Improvement to Similijhore - Narayan Prasad - Ambagaon under BRGF

12.00

Yes

Yes

Yes

Yes

Yes

5.06.10

Yes

 

 

1 No Box-cell Bridge ( 6.00 x 2.50 )

 

1 No Box-cell Bridge ( 6.00 x 2.50 )

 

12.00

12.00

Compleed

 Position of PMGSY MISSING LINK Bridge Projects

Rs. in lakhs

Sl.No

Name of work

Sanctioned cost

Allotment / Expenditure

Programme of 2010-11

Remarks

Estimated cost

Year

Allotment

Uptodate Expenditure

6/10

7/10

8/10

9/10

10/10

11/10

12/10

1/11

2/11

3/11

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

1

Constuction of S.B over Bhimdei nallah at 3.85 K.m on PWD road ( SH_41) to Uma road in the district of Boudh under NABARD Assistance under PMGSY Missing link

89.92

2009-10

102.84

98.92

 

 

 

 

 

 

 

 

 

 

Work Completed.

120.22

 

 

 

2

Construction of Bridge over Khajuripada nallah on 11th K.m  on Baghiapada- Sagada road near Ambajhari in the district of Boudh under PMGSY Missing link

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The proposals have been sanctioned under 60 nos of bridges for Orissa awaiting  final clearance from MoRD for taking up the works

150.201

 

 

 

3

Constuction of S.B over Laxmi Nallah at Ist K.m of Tileswar - Shyamsundarpur road in the district of Boudh under PMGSY Missing link.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 -do-

311.152

 

 

 

4

Construction of H.L Bridge over Mehuruni Nallah on 7th K.m of manmunda- Sagada road under PMGSY Missing link

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 -do-

466.73

 

 

 

5

Construction of S.B over Andhari Nallah at 5th K.m of Tileswar - Syamsundarpur road in the district of Boudh under PMGSY Missing link

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 -do-

350.367

 

 

 

6

Construction of H.L Bridge over Khajuria Nallah on 18th K.M of Boudh  - Dhalpur
( Hatagaon Chhak to Dhalpur portion) road under PMGSY Missing link

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 -do-

231.244

 

 

 

 

Top

Rural Water Supply & Sanitation

sl. No  Particulars   Boudh Harabhanga Kantamal Total
1 Total nos. of Habitation (As per 2003 status survey)     Status as on 1.04.2007

 

 

 

  1039 859 1046 2944
FC 1021 857 1046 2924
PC 5 2 - 7
NC - - - 0
2 Total nos of tube wells as on 15.03.11

 

Running 1634 1268 1703 4605
Defunct 60 40 19 119
3 Total nos of Sanitary wells as on  15.03.11   39 81 10 130
4 No. of completed piped water supply projects   17 14 24 55
5 No. of ongoing piped water supply projects   14 27 14 55
6 No. of completed piped water supply projects (WODC)   1 - - 1
7 IHHL Coverage (BPL + APL)   5080 +816 9738 + 1050 7578 + 883 22396 + 2749
8 Total No. of School   273 226 254 753
9 No. of School Toilet covered   216 194 174 584
10 Total no. of Anganwadi Center (Govt. + Pvt.)   70 + 106 93 + 18 95 + 61 258 + 185
11 No. of Anganwadi toilet covered (Govt. + Private)   62 + 98 91 + 17 92 + 56 245 + 171
12 Position of SEMs (Required – Available= Balance)   64 – 42 =22 52 -36 =16 68 – 54 =14 184 – 132 =52

 

PWS Schemes as per action plan 2010-11   ( Coverage )
Sl. No. Name of the Division /District Name of Block Name of the GP Location of the Scheme  Estd. Cost Expr. Upto 30.06.10 Budget provision 2010-11 Physical Progress Remarks
Source Pump house Dist. System OHT/ UGR Energisation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Boudh Harabhanga Tileswar Tileswar 41.50 24.77 21.98 C C C NS C Comissioned,09-10
2 Boudh Kantamal Khuntigora Khuntigora 37.37 24.62 15.26 C C C C C Comissioned,09-10
3 Boudh Harabhanga Sankulei Mallikpada 35.72 17.86 18.22 C C C NS C Comissioned,09-10
4 Boudh Harabhanga Sampoch Sampoch 37.40 11.94 25.00 C T T NS NS  
5 Boudh Boudh Khuntabandh Chandigarh 37.95 0.00 18.20 C NS UP NS NS Dist.System/OHT Tender  called
6 Boudh Boudh Sagada Sagada 46.66 1.27 20.00 C UP UP NS NS do
7 Boudh Boudh Laxmiprasad Majhiagora & Gudhiali 49.79 27.08 30.00 C C C NS C Comissioned,10-11
8 Boudh Boudh Baunsuni Maulimunda 33.50 0.00 18.00 C C C NS NS  
9 Boudh Boudh Padmanpur Padmanpur 29.15 0.00 20.00 C T T NS NS  
10 Boudh Boudh Gochhapada Gochhapada 40.56 19.20 20.00 C UP C NS UP  
11 Boudh Boudh Bahira Bahira 49.96 15.02 25.00 C C C NS C Comissioned,10-11
12 Boudh Harabhanga Bamanda Bamanda 42.5 6.62 20.00 C UP C NS UP  
13 Boudh Harabhanga Bamanda Debgarh 47.75 12.40 20.00 C C UP NS UP  
14 Boudh Harabhanga Ramgarh Ramgarh 47.8 24.55 12.00 C C C NS C Comissioned,10-11
15 Boudh Harabhanga Sankulei Sankulei 37.12 18.79 23.30 C C C NS C Comissioned,10-11
16 Boudh Harabhanga Ramgarh Pargalpur 28.07 10.60 15.00 C C C NS C Comissioned,10-11
17 Boudh Harabhanga B.B.Pur Tukulunda 38.60 4.08 25.00 C C C NS NS  
18 Boudh Harabhanga Adenigarh Adenigarh 47.9 4.75 25.00 C UP T NS UP  
19 Boudh Harabhanga Harabhanga Surundi  42.25 0.00 10.00 T T T NS NS Source to be done
20 Boudh Harabhanga Harabhanga Dianghat  33.13 0.00 12.00 T T T NS NS Source to be done
21 Boudh Kantamal Ghantapada Ghantapada 36.83 22.57 16.27 C C C NS C Comissioned,10-11
22 Boudh Kantamal Khumntigora Charbhati  39.96 20.81 25.65 C C C C UP  
23 Boudh Kantamal Kantamal Deuladunguri 18.30 0.00 12.00 C UP NS UP UP Dist.System/OHT Tender  called
24 Boudh Kantamal Kantamal Bandhapali 22.60 0.00 10.45 C UP NS UP UP do
25 Boudh Kantamal Dapala Dapala 30.00 17.62 20.48 C C C C UP  
26 Boudh Harabhanga Sampoch Harekrishnapur 39.87 0.00 20.00 T T NS NS NS Tender  called
        TOTAL 992.24 284.55 498.81            

 

PWS Schemes as per action plan 2010-11   ( WATER QUALITY )

Sl. No. Name of the Division /District Name of Block Name of the GP Location of the Scheme  Estd. Cost Expr. Upto 30.06.10 Budget provision 2010-11 Physical Progress Remarks
Source Pump house Dist. System OHT/ UGR Energisation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Boudh Harabhanga Tileswar Khandahota 29.00 16.06 10.78 C C C NS C Commissioned , 09-10
2 Boudh Kantamal Ambagaon Ambagaon 47.90 31.83 8.00 C C UP NS C Commissioned , 09-10
3 Boudh Kantamal Khaliaplai Khaliapali 39.25 10.58 5.00 C C C NS C Commissioned , 09-10
4 Boudh Boudh Baghiapada Nuapali 49.6 15.75 5.00 C UP UP NS UP Pump house/Dst. System tender  called
5 Boudh Boudh Padmanpur Makundapur 38.38 21.63 1.83 C C C NS C Commissioned , 10-11
6 Boudh Harabhanga Bamanda Naikpada & Raghunath Pur 49.32 37.13 0.50 C UP UP NS UP  
7 Boudh Harabhanga Kusanga Kusasinga 37.12 13.83 6.19 C C C NS C  
8 Boudh Harabhanga Bandhapathar Bandhapathar 42.48 13.47 7.82 C C C NS C Commissioned , 10-11
9 Boudh Harabhanga Mathura Mathura 40.80 7.54 8.00 C UP T NS UP  
10 Boudh Harabhanga B.N. Pur Hatagaon 37.60 2.24 8.00 UP UP UP NS NS  
11 Boudh Harabhanga Bamnada Birigarh 39.62 0.00 6.36 T NS NS NS NS  
12 Boudh Harabhanga Kusanga Mahalikpada 49.43 2.26 15.00 T NS NS NS UP  
13 Boudh Kantamal Baragochha Baragochha 42.24 27.59 0.46 C C C C UP  
14 Boudh Kantamal Bilaspur Bilaspur 38.99 32.72 2.59 C C C C C Under trial Run
15 Boudh Kantamal Palsagora Para 38.29 11.83 1.47 C C C C UP  
16 Boudh Harabhanga Banibhusanpur Lokapada 42.35 0.00 3.22 NS NS NS NS NS Source tender to be called
17 Boudh Kantamal Ghikundi Ghikundi 35.30 0.00 3.00 NS NS NS NS NS Source tender to be called
        TOTAL 697.67 244.46 93.22            

 

PWS Schemes as per action plan 2010-11   ( Sustainability )

Sl. No. Name of the Division /District Name of Block Name of the GP Location of the Scheme  Estd. Cost Expr. Upto 30.11.10 Budget provision 2010-11 Physical Progress Remarks
Source Pump house Dist. System OHT/ UGR Energisation
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Boudh Boudh Baghiapada Baghiapada 18.30 9.31 9.51 C C C NS C Under Trial
2 Boudh Boudh Laxmiprasad Janhapank 14.75 2.03 10.00 C C C NS UP  
3 Boudh Boudh Talasarada Sangrampur 15.52 5.62 3.00 C C C NS UP  
4 Boudh Boudh Bahira Juramunda 8.53 3.64 2.00 C C C NS UP  
5 Boudh Boudh Laxmiprasad Laxmiprasad 22.10 9.28 2.50 C C C NS C Commissioned
6 Boudh Harbhanga Purunakatak Rajing 9.65 1.82 3.70 C C C NS C  
7 Boudh Harbhanga Sampoch Rambhikata 11.62 4.23 3.00 C C C NS C  
8 Boudh Harbhanga B.N.Pur Biramchandrapur 13.37 6.26 3.00 C C C NS C  
9 Boudh Harbhanga Sampoch Nuapada 9.50 3.62 3.10 C C C NS C  
10 Boudh Harbhanga Kusanga Kumari 34.50 13.62 20.69 C C C C C Commissioned 10-11
11 Boudh Kantamal Jogendrapur Jogendrapur  8.25 6.18 5.21 C C C C C  
12 Boudh Kantamal Kantamal Dumalpali 8.50 4.26 3.26 C C C NS UP  
        TOTAL 174.59 69.87 68.97            

 

COMMISSIONED RURAL PIPED WATER SUPPLY SCHEMES   TILL 30.11.2010
Sl. No Block Name of the PWS schemes Comissioned Date of Commissioning
1 2 3 16
1 Boudh  Baunsuni 06.02.1995
2 Boudh  Murusundi 27.03.2004
3 Harbhanga  Harbhanga 01.07.1998
4 Harbhanga Charichhaka (Tidikajore) 06.12.2001
5 Harbhanga  Purunakatak 22.12.2002
6 Harbhanga  Karanjakata 22.12.2002
7 Harbhanga  Sarasara 16.10.2006
8 Kantamal  Kantamal 31.12.1973
9 Kantamal  Manamunda 15.08.1997
10 Kantamal Gabjore & Patharla 1.03.2006
11 Harbhanga Kusanga Commissioned 08-09
12 Harbhanga Bhaliagora Commissioned 08-09
13 Kantamal Dhungiapadar Commissioned 08-09
14 Kantamal Damamunda Commissioned 08-09
15 Kantamal Gudvelipadar Commissioned 08-09
16 Kantamal Unchbahali Commissioned 08-09
17 Kantamal Malikuda Commissioned 08-09
18 Kantamal Nurpa Commissioned 08-09
19 Kantamal Khatkhatia Under trial
20 Kantamal Baragaon Commissioned 08-09
21 Boudh Telibandh Commissioned 08-09
22 Boudh Badhigaon Commissioned  but due to public  dispute water supply interrupted
23 Boudh Ainlapali Commissioned 08-09
24 Boudh Kankala Commissioned 08-09
25 Boudh Laxmiprasad Commissioned  but due to non payment of electric bill current supply disconnected
26 Harbhanga Kutijhar Commissioned 08-09
27 Harbhanga Bhejigora Commissioned 08-09
28 Kantamal Rabidi Commissioned 08-09
29 Boudh Talasarada Commissioned 08-09